Wind farms currently under construction

DateWind farmLocationPower (MW)TurbinesMW CapacityAnnual homes equiv*.DeveloperLatitudeLongitude
December 2008 Castle Pill Farm Pembrokeshire Infinergy   
October 2008 Liniclate Wind Farm Western Isles 0.9 Element Wind Ltd   
October 2008 Long Park Scottish Borders 19 38 21248 Wind Prospect 55 40 23N 02 50 11W 
October 2008 Millennium (Glenmoriston) extension Highland 2.5 10 5591 WCE 57 08 04N 04 49 56W 
October 2008 Gruig Co Antrim 2.5 10 25 13979 RES UK & Ireland Ltd 55 01 32N 06 14 58W 
October 2008 Hunter's Hill Co Tyrone 2.5 20 11183 RES UK & Ireland Ltd 54 27 01N 07 18 25W 
September 2008 Parc Cynog Extension I (Pendine) Carmarthenshire 0.8 4.8 2684 Nuon Renewables 55 51 28N 04 34 40W 
September 2008 Lissett Airfield North Yorkshire 2.5 12 30 16774 Novera 54 00 35N 00 15 15W 
September 2008 Thanet  300 167745 Warwick Energy 51 25 00N 01 37 00E 
September 2008 Beinn an Tuirc Extension Argyll & Bute 19 38 21248 Scottish Power 55 33 56N 05 34 12W 
August 2008 Crystal Rig 2a (aka Ila Project) Scottish Borders 27 15097 Fred Olsen Renewables 55 54 14N 02 32 38W 
August 2008 Crystal Rig 2 (extension) Scottish Borders 2.3 51 117.3 65588 Fred Olsen Renewables 55:54 24N 02 33 06W 
August 2008 Moel Maelogen Extension Conwy 1.3 11.7 6542 Ail Wynt Cyf 53 08 08N 03 43 24W 
July 2008 Balloo Wood Co. Down 0.8 0.8 447 TCI Renewables   
June 2008 Little Cheyne Court Kent 2.3 26 59.8 33437 npower renewables 50 58 35N 00 50 36W 
April 2008 West Durham County Durham 12 24 13420 Banks Developments 54 46 05N 01 49 18W 
April 2008 Gunfleet Sands I Essex 3.6 30 108 60388 DONG Energy 51 43 50N 01 12 50E 
April 2008 Gunfleet Sands II Essex 3.6 18 64 35786 DONG Energy 51 43 00N 01 12 50E 
March 2008 Port of Liverpool / Mersey Docks Merseyside 2.5 10 5591 Peel Wind Power Ltd 53 27 31N 03 01 49W 
February 2008 Carno Extension Powys 1.3 12 15.6 8723 Amegni 52 33 02N 03 36 01W 
January 2008 Owenreagh Extension Co Tyrone 0.85 5.1 2852 EF Energy 54 48 30N 07 19 54W 
January 2008 Dun Law extension Scottish Borders 0.85 35 29.75 16635 RES 55 48 27N 02 51 37W 
January 2008 Edinbane Highland 1.8 13 30 16774 AMEC Wind 57 25 45N 06 25 18W 
January 2008 Aikengall East Lothian 16 48 26839 Community Windpower 55 55 36N 02 27 28W 
January 2008 Garves Mountain / Dunloy Co Antrim 15 8387 Your Energy   
August 2007 WWF Roskrow Barton Cornwall 0.85 1.7 951 Cornwall Light & Power 50 10 19N 05 09 08W 
July 2007 Slieve Divena 1 Co Tyrone 2.5 12 30 16774 RES UK & Ireland Ltd 54 30 27N 07 06 19W 
July 2007 Rhyl Flats Conwy 3.6 25 90 50323 npower renewables 53 22 00N 03 39 00W 
April 2007 Langley Park/Long Edge County Durham 4473 EdF 54 47 42N 01 40 02W 
December 2006 Solway Firth/Robin Rigg B Dumfries & Galloway 30 90 50323 E.ON UK Renewables 54 45 00N 03 41 00W 
December 2006 Solway Firth/Robin Rigg A Dumfries & Galloway 30 90 50323 E.ON UK Renewables 54 45 00N 03 41 00W 
November 2006 Inner Dowsing Lincolnshire 3.6 27 16 8946 Centrica Renewable Energy Ltd 53 11 00N 00 26 00E 
November 2006 Lynn Lincolnshire 30 16 8946 Centrica Renewable Energy Ltd 53 07 39N 00 26 10E 
October 2006 Whitelee, Eaglesham Moor East Renfrewshire 2.3 140 179 100088 Scottish Power 55 41 14N 04 13 43W 
October 2006 CAT I repowering Powys 0.5 0.5 280 Bro Dyfi Community renewables 52 37 09N 03 49 54W 
August 2006 Arnish Mhor Western Isles 1.3 3.9 2181 Farm Energy 58 10 42N 06 25 39W 
August 2006 Hydro Polymers County Durham 0.25 0.5 280 Hydro Polymers / TNEI 54 36 54N 01 34 33W 
January 2006 Tangy Extension Argyll & Bute 0.85 3355 Scottish & Southern 55 29 38N 05 40 45W 
October 2005 Ardkinglass/Clachan Flats Argyll & Bute 15 8387 Scottish Power 56 17 16N 04 56 55W 
August 2005 Swansea Docks Swansea 0.25 0.25 140 EnergyTech 51 36 33N 03 55 20W 
 Lotus Cars Norfolk 3355 Ecotricity N 52 33 51 E 01 11 01 
    6521584.7886083   

41 records were returned

All figures given are the result of standard BWEA calculations. Specific project information may vary.

*Annual homes equivalent
Over the course of a year, the wind farm would be expected to provide enough electricity to serve this many households. This calculation is based on a capacity factor of 30% and an average household consumption of 4,700 kWh/year.

The accuracy of this number will vary according to the actual capacity factor of the wind farm and the electricity usage in the locality. For example, if most of the houses have gas fired central heating, then the homes equivalent will be higher. Equally, electric heating would result in a lower homes equivalent.

At very good sites the capacity factor can be over 40%. At other sites the capacity factor may be under 30%.

Methodology for these and other benefits can be found at calculations for wind energy statistics.